Canton: Zurich
Screed contractor in the canton of Zurich
Screed contractor in the canton of Zurich: describe the work, the exact location and the conditions on site. Add your preferred dates and useful photographs to prepare your quote request.
Local quote request
Describe your project now
Share the work needed, the postcode and any photos you have. A clear request helps our team forward it to the relevant companies.
- No client account required
- Request reviewed before forwarding
- Contact details shared only with eligible companies
Your contact details are not published. A summary of the work may be forwarded to the relevant companies.
Quotes and timescales are agreed directly with the companies.

Work and requirements
- Area in m² and number of rooms, available depth between slab and finished floor
- Type of screed wanted: sand-cement, liquid anhydrite, with insulation or underfloor heating
- Floor covering planned afterwards (tiles, parquet, resin) and condition of the existing slab
- Access for the pump or lorry, storey, preferred date and overall building schedule
Your project in the canton of Zurich
Around the Limmat and the lake, the canton of Zurich offers a great variety of buildings. In the city of Zurich, older rental buildings, condominium flats and old town buildings stand side by side in a dense setting where parking is scarce. Winterthur, the canton's second city, has a lively old town and converted industrial districts. On the lakeshores, Thalwil, Horgen and Wädenswil have many villas and houses with views, often on slopes. The Zurich Oberland, around Uster, combines residential districts and villages, while in the north, Kloten and Bülach have grown around the airport. The canton is German-speaking, but your request can be written in English. An extension or work in an old town may involve formalities, and your municipality will tell you which. Give the municipality and postcode, building access and any restrictions in an occupied home or operating business premises.
- In the city of Zurich, mention the parking options and whether there is a lift.
- For a lakeside villa on a slope, describe access to the plot and any outdoor steps.
- For a condominium building, say whether the work concerns only your own unit or the communal areas too.
Screeding work in the canton of Zurich
The canton of Zurich has a very large number of apartment buildings, flats in condominium ownership and new builds, in Zurich as in Winterthur. Screed layers work on large-scale sites, where screeds are poured floor by floor, as well as in renovations of occupied flats. In older buildings in the city districts, removing old screeds, sound insulation and switching to underfloor heating are coordinated with the property management company or the co-owners. The former industrial sites of Winterthur, converted into lofts, lend themselves to exposed ground screeds. In town, parking a pump on the public road must be prepared, so check with the municipality.
- In a rented flat or condominium, ask for the written consent of the owner or the co-owners before touching the screed.
- For an exposed screed, have a finish sample made so that you can choose the colour and degree of grinding.
Request a quote in the canton of Zurich
Request a quote in the canton of ZurichQuotes and timescales are agreed directly with the companies.
Who handles your request
- Your request is read by the e-quote.ch team in Geneva before it is forwarded.
- The request is handled according to the trade and work location you specify.
- You compare the replies freely, with no obligation; the quote and contract are agreed directly with the company.
e-devis.ch is operated from Geneva. The platform forwards requests and does not carry out the work. How it works · Contact
Main municipalities
Other trades in the canton of Zurich
Frequently asked questions
What should be ready before a screed is laid in Zurich?
Ask the contractor which preparatory layers, weather protection and checks are required for the specified screed. Provide the floor build-up and any underfloor heating documents. Agree responsibility for completing and checking these items before pouring, rather than preparing hidden installations yourself.
When can a new screed receive its final floor covering?
Readiness depends on the screed system, thickness and actual drying conditions. The flooring installer needs the relevant moisture assessment rather than an assumed date. Ask who checks readiness and how the heating and ventilation instructions will be passed to the next trade.
What should I compare in screed contractor quotes?
Compare the screed type, thickness, insulation, joints and surface preparation included. Establish the intended finished floor height and the responsibilities for moisture checks. Ask whether pumping access, protection and coordination with underfloor heating and the final covering are part of the scope.
How should I prepare for the screed contractor visit or work?
Provide floor plans and details of heating or services within the floor. Confirm which preparatory layers and checks are completed before pouring. Agree clear access, material delivery and the conditions for using the rooms afterwards with the screed contractor.