Skip to content

Canton: Jura

Full renovation in the canton of Jura

Full renovation in the canton of Jura: describe the work, the exact location and the conditions on site. Add your preferred dates and useful photographs to prepare your quote request.

Local quote request

Describe your project now

Share the work needed, the postcode and any photos you have. A clear request helps our team forward it to the relevant companies.

  • No client account required
  • Request reviewed before forwarding
  • Contact details shared only with eligible companies

Your contact details are not published. A summary of the work may be forwarded to the relevant companies.

Start my request

Quotes and timescales are agreed directly with the companies.

Full renovation site in a Swiss flat with stripped walls and new installations being fitted

Work and requirements

  • Total floor area in m² and number of rooms concerned
  • Year of construction, current condition and any existing surveys (asbestos, structure, lead)
  • Trades required: electrics, plumbing, heating, insulation, flooring, kitchen, bathroom
  • Site access, floor level, lift availability and intended start date

Your project in the canton of Jura

For work in the canton of Jura, identify the property by its municipality and postcode, whether in Delémont, Porrentruy, the Franches-Montagnes, Moutier or another municipality. Describe the part of the building concerned and its current condition. If the property includes both living rooms and former farm spaces, identify which areas belong to the project instead of assuming that all parts need the same work. Give vehicle access, any narrow passage or steps, and whether the building will remain occupied. For a conversion or an exterior alteration, clarify the project-specific requirements with the municipality or competent authority and provide any existing protection or approval documents.

  • For a farmhouse in the Franches-Montagnes, specify which part (living quarters, barn, stable) is concerned.
  • Mention your current heating system, as insulation matters a great deal given the Jura winters.
  • In the old town of Porrentruy or Delémont, describe access from the street and the space available in front of the house.

Complete renovation in the canton of Jura

In the Jura, complete renovations often concern large farmhouses in the Franches-Montagnes or Ajoie, part of whose barn is converted into living space. These buildings with limestone walls and imposing roofs require an overall approach to insulation, heating and daylight. In Porrentruy, narrow, deep houses in the old town are renovated while respecting the original façades and stairwells; for the exterior, check with your municipality. In Le Noirmont and on the high plateau, the harsh winter makes the choice of windows and airtightness decisive. In Delémont, flats in apartment blocks are regularly refurbished when the property changes hands.

  • In an Ajoie farmhouse, think about daylight: opening dormers or large windows in the barn completely transforms the home.
  • On the high plateau, favour highly insulating windows and careful sealing around the frames, as cold wind gets in easily.

Request a quote in the canton of Jura

Request a quote in the canton of Jura

Quotes and timescales are agreed directly with the companies.

Who handles your request

  1. Your request is read by the e-quote.ch team in Geneva before it is forwarded.
  2. The request is handled according to the trade and work location you specify.
  3. You compare the replies freely, with no obligation; the quote and contract are agreed directly with the company.

e-devis.ch is operated from Geneva. The platform forwards requests and does not carry out the work. How it works · Contact

Main municipalities

All localities in the canton of Jura

Other trades in the canton of Jura

Frequently asked questions

How is a full renovation organised in Jura?

It starts with a site visit and a clear definition of the project, followed by the necessary plans and formalities. The trades then work in a planned order, usually from demolition to finishes. Regular site meetings let you follow progress and approve choices.

How can the scope of a full renovation be kept manageable?

Break the project into rooms and work packages, then identify their interfaces and the person coordinating them. Existing structure and installations need assessment before the final sequence is agreed. Ask how choices, discoveries and changes will be documented and approved throughout the project.

What should I compare in full renovation quotes?

Compare surveys, design, removal, installations and finishes against the same detailed brief. Check which work packages are provisional and who coordinates them. Ask for a project-specific sequence and approval process, rather than relying on a generic duration for a whole-property renovation.

How should I prepare for the full renovation visit or work?

Gather plans, earlier reports and a list of retained features. Describe occupancy and access constraints early. Agree surveys, protection, storage and temporary services with the project team; do not strip out old materials before the required assessments and work sequence have been established.

Localities and postcodes: swisstopo