Canton: Geneva
Full renovation in the canton of Geneva
Full renovation in the canton of Geneva: describe the work, the exact location and the conditions on site. Add your preferred dates and useful photographs to prepare your quote request.
Local quote request
Describe your project now
Share the work needed, the postcode and any photos you have. A clear request helps our team forward it to the relevant companies.
- No client account required
- Request reviewed before forwarding
- Contact details shared only with eligible companies
Your contact details are not published. A summary of the work may be forwarded to the relevant companies.
Quotes and timescales are agreed directly with the companies.

Work and requirements
- Total floor area in m² and number of rooms concerned
- Year of construction, current condition and any existing surveys (asbestos, structure, lead)
- Trades required: electrics, plumbing, heating, insulation, flooring, kitchen, bathroom
- Site access, floor level, lift availability and intended start date
Your project in the canton of Geneva
For a project in Geneva, give the municipality and postcode, the rooms or building elements involved and the outcome you want. Describe the actual access: floor, lift, vehicle approach, parking and space for deliveries. Say whether the home or business premises will remain in use during the work. In a rented property or condominium, identify which areas are private and which are shared, and who coordinates decisions about them. If the project changes the exterior or concerns a protected building, check the applicable requirements with the competent authority before starting. Photos, existing plans and any approval documents already available help define the work without assumptions about a neighbourhood’s buildings.
- In a rental building or condominium, say whether the property management company or the co-owners have already given their agreement.
- For a flat in town, give the floor, whether there is a lift and what parking is available.
- For a villa in the Geneva countryside, describe access to the garden if machinery needs to get in.
Complete renovation in the canton of Geneva
In Geneva, many complete renovations involve condominium flats bought in older buildings, which new owners want to bring entirely up to date. Bathroom, kitchen, floors, electrics and sometimes the room layout are then handled in a single project. The co-ownership regulations often set the hours for noisy work and the use of the lift, so consult them before starting. In Cologny or Versoix, villas near the lake undergo heavier renovations, sometimes with an extension or attic conversion. For any exterior alteration or raising of the roof, check with your municipality. In rental buildings, it is usually the property management company that organises the refurbishment of a home between two tenants.
- In a condominium, inform the administrator and your neighbours before the work begins, and have the common areas used by the workers protected.
- For a Geneva villa, have the condition of the roof and insulation checked before choosing the interior finishes.
Request a quote in the canton of Geneva
Request a quote in the canton of GenevaQuotes and timescales are agreed directly with the companies.
Who handles your request
- Your request is read by the e-quote.ch team in Geneva before it is forwarded.
- The request is handled according to the trade and work location you specify.
- You compare the replies freely, with no obligation; the quote and contract are agreed directly with the company.
e-devis.ch is operated from Geneva. The platform forwards requests and does not carry out the work. How it works · Contact
Main municipalities
All localities in the canton of Geneva
Other trades in the canton of Geneva
Frequently asked questions
How is a full renovation organised in Geneva?
It starts with a site visit and a clear definition of the project, followed by the necessary plans and formalities. The trades then work in a planned order, usually from demolition to finishes. Regular site meetings let you follow progress and approve choices.
How can the scope of a full renovation be kept manageable?
Break the project into rooms and work packages, then identify their interfaces and the person coordinating them. Existing structure and installations need assessment before the final sequence is agreed. Ask how choices, discoveries and changes will be documented and approved throughout the project.
What should I compare in full renovation quotes?
Compare surveys, design, removal, installations and finishes against the same detailed brief. Check which work packages are provisional and who coordinates them. Ask for a project-specific sequence and approval process, rather than relying on a generic duration for a whole-property renovation.
How should I prepare for the full renovation visit or work?
Gather plans, earlier reports and a list of retained features. Describe occupancy and access constraints early. Agree surveys, protection, storage and temporary services with the project team; do not strip out old materials before the required assessments and work sequence have been established.